What’s Up with the Traffic Jam on Admiralty Way? – Admiralty Way Settlement Repair Project
Marina del Rey Admiralty Way Settlement Repair Project
Construction Start Date: September 2012
Scope of Work:
Repair the settled roadway to prevent further settlement; remove existing grade and cement treat soil; reconstruct sidewalks, curbs, gutters, driveways and medians; restore existing street lights, traffic loops, roadway striping and update signage.
View an Interactive Map of the Projects Scheduled in Marina del Rey:
Similar Posts:
- “Wetland” Park Progress Update
- AMLI Marina Luxury Apartments are set to Replace Bar Harbor in Marina del Rey
- Azzurra – 13700 Marina Pointe – Marina del Rey Luxury Condos
- Just Sold – 4778 La Villa Marina #K – 2 Week Escrow!
- Marina del Rey Lofts – MDR Lofts
- FHA mortgage premium to rise on April 1 – Marina del Rey Real Estate
- Marina del Rey Skatepark – The Dog Bowl
- Russian Billionaire Roman Abramovich’s Mega Yacht ‘Luna’ was off the Coast of Marina Del Rey Labor Day Weekend