The Mariners Village Renovation Project would renovate the apartment community and open space areas.
- The project would renovate the exteriors and interiors of the 981 units, town center and other facilities on the site.
- A 92 berth anchorage and a 110 foot long public dock would be added to the waterside.
- The town center renovation would expand commercial space by 7,000 sq. ft. within the existing footprint.
- The project would also renovate the infrastructure on the side and replace the existing landscaping with large amounts of drought tolerant plants and water-efficient irrigation systems.
- ‘The renovation activities would require residential units to be sequentially vacated during work to their buildings or related infrastructure. :(
- Parking on the site would also be increased by over 300 spaces.
The best part of this project, in our opinion, is that it’s going to eliminate the dead-end conditions and provide a connection from Captains Row to Northwest Passage and from the town center to Old Harbor Lane. The existing private waterfront walkway and utility road will turn into a 25 foot wide public promenade that would connect with neighboring parcels.
